Boroondara's pergola guide distinguishes Planning Permits from Building Permits. It lists a Heritage Overlay as a planning trigger and sets out separate building checks for size, height and position. Council also defines a pergola as an open or water-permeable structure, not a solid-roofed structure. A roofed proposal may need a different assessment, so do not assume every structure sold as a pergola follows the same rules.
Tree protection is relevant to construction even when no tree is being removed. Under Council's Tree Protection Local Law, works within 2 metres of a protected canopy tree's trunk, or within a significant tree's Tree Protection Zone, require a Tree Works Permit. Excavation for paving, digging post holes and storing materials can all affect the work area. Planning overlays may add requirements. At pool edges, confirm barrier compliance separately before introducing seating, new levels or structures near the fence.
These notes are a starting checklist, not site-specific approval advice or a promise that permits are included in a PJR quote. Confirm responsibilities, required professional input and any approvals before work starts. Council or your building surveyor should confirm the requirements for your address and design.